Tunnel aisle through loaded pallet rack in a distribution warehouse

Expert fire code consultants and former FM inspectors on staff

Fire code consulting for complex facilities.

Warehouse, industrial, manufacturing, data center, battery and energy storage, and school buildings, from feasibility through permit approval and final acceptance. Based in Houston, working across Texas.

Received a fire marshal correction letter?Comments have deadlines. Send the letter and IgnitionTech replies with the code basis and a response strategy.Get quick help

What IgnitionTech does

Four practices that carry most of the work

Each one ends in a document a fire marshal can approve. The code section sits beside every conclusion.

High-piled storage consulting

The permitting division: High-Piled Permits

High-piled storage has been the center of the practice since 2009. Commodity classification, rack and aisle layout, sprinkler-to-storage compatibility, fire department access, and the operational permit itself run through the High-Piled Permits division so warehouse operators, rack dealers, and brokers have one place built for that work.

IgnitionTech carries the code consulting, hazardous materials, energy storage, and due diligence work that sits around the storage permit.

Storage height marked against a loaded rack bay
Newly installed teardrop pallet rack before loading
In-rack sprinkler with a flue space protector
Reach truck placing encapsulated Group A plastic commodity

Why IgnitionTech

Built for the reviewer's desk, not the brochure

Most consulting websites list capabilities. This firm lists what gets delivered and who has to approve it.

Principal-led

The person who scopes the project is the person who writes the analysis and sits across from the fire marshal.

Texas AHJ experience

Submittals to Houston, Harris County, and the surrounding cities since 2009, with the local amendments and the reviewers' habits learned on real projects.

Permit-ready deliverables

Every page is written for the reviewer who has to approve it, with the code section beside each conclusion.

Former FM inspectors on staff

Insurer expectations and code requirements are reconciled before they conflict on the job site.

Start with a project review.

Describe the building, the jurisdiction, and the deadline. IgnitionTech replies with the code path and a proposed scope.