
Industry
Healthcare and Medical Buildings
Clinics, laboratories, and medical office buildings carry hazards that the base occupancy does not describe: compressed and cryogenic gases, flammable solvents, and oxidizers in quantities that have to be inventoried against the control area limits of the 2021 International Fire Code (IFC) Chapter 50.
IgnitionTech prepares the hazardous materials inventory and management plan, resolves the occupancy classification for lab and clinic spaces, and supports the design team through plan review on renovations and tenant finish-outs.
Services for this facility type
Hazardous Materials Consulting
HMIS and HMMP preparation, maximum allowable quantities, control areas, and Group H analysis.
Learn moreFire and Building Code Consulting
Occupancy, allowable area, egress, and plan review comment responses for complex buildings.
Learn moreExisting-Building Assessments and Due Diligence
Pre-lease and pre-acquisition fire code reviews, change-of-occupancy analysis, and inspection preparation.
Learn moreRequest a project review
Tell IgnitionTech about the building.
Address, jurisdiction, what the facility will do, and when it needs to be open. The reply includes the code path and a proposed scope.
Or call 713-491-6539.
Architects, brokers, and contractors in this sector
IgnitionTech works alongside design teams, tenant reps, rack dealers, and sprinkler contractors as the code resource on their projects.